HomeServicesProject & Heavy Cargo

Cargo that does not fit. Routes that need a plan.

Turbines, transformers, prefabricated modules, mining equipment. We plan the route, write the lift method, secure the permits, and put the right ship on charter.

Engineering-led freight planning

A project shipment is a study, not a booking.

Before a generator or a refinery vessel moves, our project desk produces a freight study: cargo manifest with weights and centres of gravity, route survey of the bridges and overpasses, JKR and police permit timeline, escort and pilot-car plan, crane and lift-rigging method, and the recommended ocean window.

From the project gate at Lumut, Pasir Gudang or Westports to the receiving site, we manage one continuous lift plan. Our staff have moved gas turbines for IPP projects in Pahang, transformers into the Kerian and Bekok substations, and prefabricated bridge sections to Sabah.

  • Out-of-gauge surveys with 3D load drawings on request.
  • JKR special permits and Polis DiRaja Malaysia escort coordination.
  • Heavy-lift cranes up to 750 t, hydraulic SPMT trailers, modular gantries.
  • Chartered breakbulk and tween-decker vessels for project consignments.
  • Marine surveyor and warranty-surveyor liaison on critical lifts.
Mobile crane lifting a heavy turbine generator at a Malaysian project site
What we plan

Six workstreams that run in parallel on every project booking.

Route survey

Bridge load ratings, overhead-clearance audit and a turn-by-turn driveability map for the inland leg.

Permit pack

JKR special permit, PDRM escort, MOT abnormal-load authorisation, and any state-level approvals.

Lift method

Crane selection, rigging plan, lift-point analysis and the lift-on/lift-off sequence at the port.

Vessel chartering

Tween-decker, multi-purpose carrier or full-charter breakbulk, depending on weight and shipment count.

Customs & bond

Temporary import schemes, MITI approvals, and bonded staging for cargo awaiting site readiness.

HSE & warranty

JSA, lift-plan sign-off, and coordination with project-cargo warranty surveyors.

Representative case work

A few project shipments from the last two years.

Lumut IPP — gas turbine train

Three 220-tonne turbine modules moved from Westports to Lumut over four nights, with full PDRM escort and a 14-axle SPMT.

Bekok substation — 90 t transformer

Imported via flat-rack into Pasir Gudang, road-moved to the substation through a JKR-coordinated overnight closure of the federal road.

Sabah bridge — pre-cast segments

Twenty-eight pre-cast bridge segments out of Kuantan Port via partial-charter breakbulk to Kota Kinabalu, with shore-to-site barge handover.

Penang fab — clean-room modules

Time-critical airlift on a chartered freighter from Frankfurt into Penang, followed by an escorted overnight move to the wafer fab.

Pahang mining — crusher relocation

In-country relocation of a primary crusher with disassembly, marking, transport and reassembly at the new pit edge.

Kerian onshore — wind blades

Six 62-metre wind blades discharged at Penang, blade-trailer convoyed inland under PDRM escort and JKR special permit.

Planning an upcoming project shipment?

Share the cargo schedule, site readiness window and any preliminary drawings. Our project desk will reply with a written approach and a transparent quote.